Event Details


This outage is required by BJH to test the fire alarm system serving this building. During this time bells and strobes to floors 6,7, and 8 will be silenced but the main HVAC and exhaust systems including fume hoods will be disrupted several times during this time frame as we test floor to floor. The original date for this test was 1-24-2015 but has been revised to this listed date.