To provide upgrades to the HVAC system there will be reduced heating , cooling, and airflow capacity available to the 10th, 11th, and 12th floors during the below times.
- 3/11/17 6am – 6pm
- 3/12/17 6am-6pm
- 3/18/17 6am-6pm
- 3/19/17 6am -6pm
To provide upgrades to the HVAC system there will be reduced heating , cooling, and airflow capacity available to the 10th, 11th, and 12th floors during the below times.