At approximately 8:00 p.m. a leak was reported on the 1st floor of the building. Facilities Engineering determined that a drain pipe had a malfunction causing the leak. and that the two Air Handler Units that provide heating and cooling for the north side of floors 9 and 10 have to be shut off to repair this drain pipe. Facilities Engineering is in the process of repairing this drain line as quickly as possible.
A follow-up notice will be delivered once the drain line has been repaired and the two Air Handler Units can be restored to normal operating condition.
We thank you for your patience and understanding at this time.