The purpose of this outage notification is to inform the occupants of the BJC Institute of Health building that BJC will be performing a Final Test and Inspection of the Life Safety System (Fire Alarm, Sprinklers, Smoke Dampers, HVAC Systems) on the sound end of floors 3 and 4 as part of a BJC construction project with the City of St. Louis Building Inspection Division. The floors that are above the 6th floor should not be impacted by this test.