In order to conduct an exhaust fan switch over and run test there is a risk of exhaust failure during this time. Although we do not anticipated a failure there shall be NO worked conducted in the BSL-3 lab during this time.
In order to conduct an exhaust fan switch over and run test there is a risk of exhaust failure during this time. Although we do not anticipated a failure there shall be NO worked conducted in the BSL-3 lab during this time.