During the next two weekends, Clayco will be performing work north of the Metro garage in preparation for a new pedestrian link from the future MCC building to the Metro garage. The work will be performed on the following dates:
- Sunday, October 18th
- Saturday, October 24th
- Sunday, October 25th
During this time, a portion of the sidewalk north of the garage will be blocked by equipment. Vehicular access to the garage will remain open during the work times.