This is a full building electric shutdown for both buildings, during this time no normal power will be available in either building. The only power will be from the generator sets. There will be no air conditioning, lab vac. lab air, and any dept. owned equipment not on emergency power. This is needed to put the electric system back to normal from the outage earlier this week from Ameren. Please shut off any computers not on UPS’s at the end of today and restart tomorrow morning.