The purpose of this outage is to change the I.P. address in a Building Automation Controller and to perform a maintenance item on a VAV box for the BSL3 Lab. During the process of changing the I.P. address there may be a possibility of a momentary interruption of chilled water as the Chilled Water Plant may shut down momentarily until the change is complete. It is anticipated that this process will take no longer than 10 minutes. The maintenance work related to the BSL3 lab will only effect the air supply to the space as a device on the VAV box controller has to be replaced and re-commissioned.