The purpose of this outage is to perform a total Fire Sprinkler shutdown to install the new sprinkler control valve for the 6th Floor Fire Sprinkler Project. During this outage no open flame or hot work should be used or performed.
The purpose of this outage is to perform a total Fire Sprinkler shutdown to install the new sprinkler control valve for the 6th Floor Fire Sprinkler Project. During this outage no open flame or hot work should be used or performed.