The purpose of this outage is to perform a test/inspection of the Air Handler Unit that supports the 5th floor. During this outage there will be interruptions of air flow several times.
The purpose of this outage is to perform a test/inspection of the Air Handler Unit that supports the 5th floor. During this outage there will be interruptions of air flow several times.